Project description
Steel canopy with 12m span and 100m length including a reinforced concrete railway loading ramp at warehouse no. 169.
For POLAR S.A., we built a steel canopy of impressive dimensions – 12 meters span and 100 meters length. The structure was erected at warehouse no. 169 and also included a reinforced concrete railway loading ramp. The implementation required precise coordination with the plant's logistics operations.

Project details
- Location
- Wrocław
- Year
- 2017
- Scope of work
- Structure Assembly
Get in touch!
Have a question or need a quote? Write to us — we'll respond as soon as possible.
Send a message