Back to references
Bolesławiec Refractory Materials Works Sp. z o.o.
Construction of Raw Material Beneficiation Plant
Reference document

Project information
- Project
- Construction of Raw Material Beneficiation Plant
- Location
- Czerwona Woda, 3 Maja 49
- Reference date
- 04.01.2006
- Value / parameter
- 1,095,425.97 PLN net
- Scope of work
- Steel structure of hall and storage baysHall roofing and claddingDrainage and sheet metal trimControl cabinHall platforms
- Summary
- Construction works from June to December 2005 at Czerwona Woda deposit: supply and assembly of steel structure, roofing, sandwich panel cladding, drainage, storage bays, control cabin, compressor container, electrical switchgear, platforms.
Jacek Włodarczyk, CEO BZMO
“The project was completed on time, with due care and in accordance with regulations and standards. Professionalism and exemplary cooperation enabled completion to BZMO's full satisfaction.”
Get in touch!
Have a question or need a quote? Write to us — we'll respond as soon as possible.
Send a message